Project Detail
The scheme provided many environmental challenges which were overcome an managed successfully throughout . The length of the site was heavily congested with SSSIs, protected , sensitive waterways and ecological habitats.
Working alongside our partners CCS scaffolding, Sian were responsible for scaffold access throughout the project along the length of the scheme. This included the design and construction of two long term temporary footbridges and complex 15m high scaffolds adjacent to live running rail lines. Being responsible for temporary works design and installation Sian again, successfully planned and managed the process providing complex and innovative temporary works design solutions.